{"id":654,"date":"2024-06-12T10:03:09","date_gmt":"2024-06-12T10:03:09","guid":{"rendered":"https:\/\/kijkme.nl\/sea\/?post_type=fw-portfolio&#038;p=654"},"modified":"2024-06-16T12:39:59","modified_gmt":"2024-06-16T12:39:59","slug":"railroad-construction-epc","status":"publish","type":"fw-portfolio","link":"https:\/\/kijkme.nl\/sea\/project\/railroad-construction-epc\/","title":{"rendered":"RailRoad  Construction (EPC)"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"543\" data-id=\"615\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m5.jpg\" alt=\"\" class=\"wp-image-615\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"800\" height=\"618\" data-id=\"614\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m4.jpg\" alt=\"\" class=\"wp-image-614\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"800\" height=\"618\" data-id=\"613\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m3.jpg\" alt=\"\" class=\"wp-image-613\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"556\" data-id=\"612\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m2.jpg\" alt=\"\" class=\"wp-image-612\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"554\" data-id=\"611\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m1.jpg\" alt=\"\" class=\"wp-image-611\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"840\" data-id=\"663\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m6.jpg\" alt=\"\" class=\"wp-image-663\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"840\" data-id=\"664\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m7.jpg\" alt=\"\" class=\"wp-image-664\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"840\" data-id=\"665\" src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/m8.jpg\" alt=\"\" class=\"wp-image-665\"\/><\/figure>\n<\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bafgh-Zarinshahr RailRoad Second lines sixth section Construction (EPC)<\/li>\n\n\n\n<li>Bafgh-Zarinshahr RailRoad Second lines second section Construction (EPC)<\/li>\n\n\n\n<li>Qazvin-Zanjan RailRoad Second lines fourth section Construction (EPC)<\/li>\n\n\n\n<li>Since 2014 I have been working as a deputy to the CEO and then as the CEO of the MehvarSazan Sadid Company. This Top-Ranking company is involved in road construction, bridge construction, and railway networks, and has recently engaged in railway projects (EPC). In this type of projects, after taking delivery of land from the employer, we initiate the project based on the employer\u2019s needs by conducting geological, geo-technic, and climatic tests, and then designing the project in the engineering section. In this connection, me and my colleagues at the MehvarSazan Sadid Company carry out all the sections of the project, including Earthwork, Concrete, Subgrade, Bridge construction, supply and purchase (Rail, Traverse, Rail Fastening, and Switches), installation, welding, mechanized activities from design to delivery to the employer. The activities of each project include over one million cubic meters of earthworks, 100000m3 of concrete operations, and the installation of over 6000 tons of rail.<\/li>\n\n\n\n<li><strong>Skills:<\/strong> Project Coordination \u00b7 Microsoft Project \u00b7 Construction \u00b7 HSE \u00b7 Civil Society \u00b7 Project Planning \u00b7 PMP \u00b7 Workplace Safety \u00b7 RMP \u00b7 Business Management \u00b7 Cash Flow \u00b7 Microsoft Office<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-video\"><video height=\"368\" style=\"aspect-ratio: 640 \/ 368;\" width=\"640\" controls src=\"https:\/\/kijkme.nl\/sea\/wp-content\/uploads\/2024\/06\/VIDEO-2023-07-13-10-15-55.mp4\"><\/video><\/figure>\n","protected":false},"featured_media":615,"template":"","fw-portfolio-category":[34],"class_list":["post-654","fw-portfolio","type-fw-portfolio","status-publish","has-post-thumbnail","hentry","fw-portfolio-category-bouw"],"_links":{"self":[{"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/fw-portfolio\/654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/fw-portfolio"}],"about":[{"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/types\/fw-portfolio"}],"version-history":[{"count":3,"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/fw-portfolio\/654\/revisions"}],"predecessor-version":[{"id":720,"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/fw-portfolio\/654\/revisions\/720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/media\/615"}],"wp:attachment":[{"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/media?parent=654"}],"wp:term":[{"taxonomy":"fw-portfolio-category","embeddable":true,"href":"https:\/\/kijkme.nl\/sea\/wp-json\/wp\/v2\/fw-portfolio-category?post=654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}